pre commissioning and hydrotest of subsea pipeline

after sending foam pigs and brush pigs gauging plate to be run in subsea pipeline for pre commissioning operation. pigs travel from pig luncher to lay down head. below figure shows the lay down head.



 gauging pig was in health condition. no damage or bend were observed